Conectividade - 10/03/2021 Construction of Ellalink cable, which will connect South America to Europe, is completed
Institucional - 13/03/2020 RNP Engineering and Operations Director is elected president of the Board of Directors of RedCLARA
02/08/2018 GÉANT and RedCLARA announce signature of BELLA contract for 25-year direct transatlantic connectivity